
Measure Twice, Cut Once
The Fort Collins team performs the I/O Testing of the UV System from Electronic Ballast Enclosures to the Plant configured HMI. Doing it now means it will work during startup when the system is installed in Fort Collins CO. After work, the team heads out to see some sites.